Logitech 920-009087
G G815 LIGHTSYNC RGB Mechanical Gaming Keyboard (GL Clicky)
Logitech G G815 LIGHTSYNC RGB Mechanical Gaming Keyboard (GL Clicky) is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Highlights:
Highlights:
Every order includes:
Every order includes:
- Fast and secure shipping
- Free 30-days returns
- Manufacturer warranty
- Lifetime customer support
Description
Description
Overview
The Logitech 920-009087 is a wired mechanical gaming keyboard designed to provide precise and responsive input with its low-profile GL Clicky switches. These switches offer tactile feedback with minimal actuation force, making them well suited for gamers who need quick key responses without the bulk of traditional mechanical keyboards. The keyboard features a slim aluminum top plate that combines durability with a sleek, modern look. Its per-key RGB lighting powered by LIGHTSYNC technology allows full customization to match your gaming setup or personal style.
Equipped with five programmable G-keys and three onboard macro profiles, this keyboard supports complex commands and shortcuts for both gaming and productivity. Dedicated media controls and a volume wheel enable easy sound adjustments without interrupting your workflow. The 5.9-foot USB-A cable ensures a stable connection to PCs or Macs, and the integrated USB passthrough port adds convenience for connecting additional peripherals.
Key features
- Low-profile GL Clicky mechanical switches that deliver fast and tactile feedback with less key travel
- Five programmable G-keys with three onboard profiles for customizing macros and commands
- Per-key RGB lighting with LIGHTSYNC technology for dynamic and personalized lighting effects
- Dedicated media controls and a volume wheel for quick and precise audio adjustments
- Durable aluminum chassis that provides a sturdy frame while maintaining a slim profile
- USB passthrough port for connecting a mouse, headset, or other peripherals directly through the keyboard
- Compatible with Windows and macOS, with full customization available via Logitech G Hub software
Key specs
- Switch type: Low-profile GL Clicky mechanical switches
- Dimensions: 18.7 x 5.9 x 0.87 inches
- Cable length: 5.9 feet (USB-A)
- Lighting: Per-key RGB with LIGHTSYNC technology
- Programmable keys: 5 G-keys with 3 onboard macro profiles
- Connectivity: Wired USB-A with USB passthrough port
- Compatibility: Windows and macOS
Connectivity and compatibility
The keyboard connects via a reliable 5.9-foot USB-A cable, ensuring stable communication with your computer. The integrated USB passthrough port allows you to plug in additional devices such as a gaming mouse or headset without needing extra USB ports on your PC. It supports both Windows and macOS platforms, making it versatile for different setups. For full access to lighting customization and macro programming, the Logitech G Hub software is required.
Ideal uses and environments
This keyboard fits well in gaming setups where fast, tactile key responses and customizable lighting enhance the experience. Its low-profile design also makes it suitable for professional environments where desk space is limited but performance cannot be compromised. Users who benefit from programmable keys for macros or shortcuts will find the G815 a strong choice for both gaming and productivity tasks. The durable aluminum frame ensures it withstands daily use in busy workstations or gaming stations alike.
Reviews (0)
Reviews (0)
Shipping and delivery
Shipping and delivery
Orders are processed within 2 business days, which includes verification, packing, and dispatch. Shipping costs are calculated at checkout based on destination, total weight, and selected speed. Free shipping applies to carts over $100 (excluding heavyweight items). All available options and final pricing are clearly shown before payment so you can choose the service that best fits your needs.
Deliveries are handled by major carriers such as USPS, UPS, and FedEx. Estimated delivery times are displayed at checkout and may vary depending on service level and location. Please note that these are estimates and can be affected by weather, holidays, or carrier volume. Once your order ships, you’ll receive a tracking number for real-time updates from pickup to final delivery.
Providing an accurate shipping address helps prevent delays, and changes may be limited once the order has been dispatched. P.O. boxes are supported only when permitted by the selected carrier. Packaging and handoff are optimized to protect items during transit, though oversized or high-weight products may require special handling. All shipping methods and any related constraints are clearly shown during checkout.
Returns and refunds
Returns and refunds
Returns are accepted within 30 days of delivery. Items must be unused, in the same condition received, with tags, manuals, accessories, and original, unaltered packaging. Any item kept will be deducted from the refund. Start a return by sending us an email. Items sent back without approval may be refused or returned to the sender.
Some items are not returnable: opened TVs/combos/monitors 37″+, opened computers or software, electronic downloads, opened consumables (film, paper, bulbs, media, ink), custom or modified computers, special-order or “nonreturnable” items, submerged underwater gear, and opened educational media.
After inspection, refunds are issued to the original payment method; allow 5–7 business days for the credit to post. Shipping, handling, customs duties, and import taxes are nonrefundable. If an item is used, incomplete, or not in original condition, a 30% restocking fee may apply. Direct exchanges are not offered; purchase the replacement and return the original for a refund.
Product warranty
Product warranty
We act solely as a reseller. Any product warranty is provided and administered by the manufacturer, not by our store. That means eligibility, coverage, and outcomes are determined by the manufacturer’s policy for each brand and model. Before purchasing, we recommend reviewing the warranty terms on the manufacturer’s website or in the product documentation to confirm what is covered and for how long.
If you need warranty service, please file the claim directly with the manufacturer. They may require proof of purchase, the product serial number, original packaging, photos, or basic troubleshooting. Some brands ask you to register the product or obtain a case number before shipping it for repair or replacement. We don’t submit or approve claims, but we can point you to the correct support links and contact details.
Keep your invoice and packaging in a safe place, and report any functional issues to the manufacturer as soon as they appear. If you’re unsure whether a problem is covered, the manufacturer’s support team can confirm next steps and timelines. While we cannot intervene in decisions or outcomes, we’re happy to provide purchase documentation or guidance so you can move through the warranty process smoothly.
















